Location: Amsterdam
Architect: Erick van Egeraat (Associated Architects)
IBS client: Mahler4 VOF
Period: 2008-2011
IBS contributed to the construction phase of this project.
- Assessment of drawings, reports and studies, calculations and design brief
- Consultancy regarding the repair of watertightness defects in the aluminium segment facade and anchoring defects in the polyester facade panels
- Survey and drawings of existing situation
- Development, supervision and inspection of additional repair work
- Air permeability measurements and watertightness tests
- Glass bead bag swing test to check impact safety
- Measuring layer thickness of the facade structure’s aluminium surface treatment
- Glass panel colour measurements